01. Definition
What is the energy crisis?
In recent years, many scientists have raised their voice to warn about climate change, caused notably by the burning of oil and coal in order to produce energy.
Solutions to the energy crisis
Over the last two centuries, energy needs have skyrocketed dramatically, especially because of the transportation and industry sectors. However, fossil fuel are polluting and their reserves are limited. We know today that these resources are close to exhaustion and our societies are facing a major challenge: the energy crisis.
01. Definition
02. Causes
03. Impacts
04. Solutions
05. Implementations
Hydrogen Power Module by Genevos implemented by Orkney Ferry in Kirkwall (United Kingdom) in 2021
FLEXINERGY INFRASTRUCTURE by Evolution Energie implemented by Groupe ADP in Paris (France) in 2018
SynchroGuard by Zaphiro Technologies implemented by SIG Services Industriels de Genève in Geneva (Switzerland) in 2024
Eocycle/EO25 Distributed Wind Turbine by Eocycle Technologies Inc implemented by TARIMÖZ in Istanbul (Turkey) in 2024
Bio-sourced vertical axis wind turbine by Phileole S. A. implemented by Foutaine Pajo /Lagoon in La Rochelle (France) in 2024
Smartec by Salvi Lighting implemented by Energy Development Corporation Limited in Kigali (Rwanda) in 2022
Multifunctional Roof Edge (MRE) by ANERDGY implemented by Anerdgy in Voreppe (France) in 2020
Power-to-X modular chemical plants by Ineratec implemented by MPC Containerships, UNITI e.V. in Frankfurt am Main (Germany) in 2024
Akeptus by Akeptus™ implemented by Ben and Jerry’s in South Burlington (United States) in 2021
BLOKIWOOD by Dom'innov implemented by Supermix in Eybens (France) in 2021
EcoStruxure ™ EV Charging Expert by Schneider Electric implemented by Renault in Guyancourt (France) in 2011
EcoStruxure ™ EV Charging Expert by Schneider Electric implemented by Montgomery County, Maryland in Montgomery (United States) in 2022
Desolenator by Desolenator implemented by Silal in Abu Dhabi (United Arab Emirates) in 2023
Desolenator by Desolenator implemented by Carlsberg Group in Bengal (India) in 2020
Desolenator by Desolenator implemented by Dubai Water and Electricity Authority in Dubaï (United Arab Emirates) in 2022
Go To-U by GO TO-U implemented by TNB (Tenaga Nasional Berhad) in Kuala Lumpur (Malaysia) in 2023
06. Conclusion